The Aerobic Treatment System is Installed

In spite of all the rain, the site folks were able to install the ATS this week. We were rocked with about three inches of rain since last weekend with some pea-sized hail thrown in for good measure. At least the existing pad is getting a good pack! These pics show just how wet it is and how difficult it would be to move this fill dirt around right now.

Jpeg

The Aerobic Treatment System

Jpeg

Standing Water in the Cistern Pad Area

Jpeg

Very Wet Loads of Fill Dirt

 

 

Advertisements