It’s a long way up to the cleared area from the main road. It would take about 1000 ft of properly graded road. Unfortunately, no properly graded road currently exists and most of the existing road is improperly graded. Let’s say that the situation as it exists is below average, so I must grade on a curve.

Advertisements